Projects for Acquisition

For More Infomation:

salesteam@innovativesolarsystemsllc.com

IS245: Indigo Solar



Project Summary:

• 125 MW
• 950 Acres
• Fisher County, TX
• Interconnect Cost: $15,191,000.00 LOC
• Production: 321,778 MWh/year
• Queue #: 21INR0031

• RTO: ERCOT
• (COD): 12/15/2021 Est.
• PPA: 2 Offtake Options

Completed Project Milestones:

• PVSyst and 8760 Reports
• Congestion Study – Favorable, ERCOT
North or South Hub Settlement
• 20-year Executed Lease &
contains four 5-year extension options
• FAA 7460-1 Compliant
• Property Tax Evaluation
• DoD Siting Clearinghouse
• Limited Title Opinion on Mineral Rights
• No Zoning Approval Required
• Soil Survey is Completed
• Current Phase One ESA is Completed
• Full Site Wetland Delineation is Completed
• Approved Jurisdictional Determination from Army Corp. of Engineers
• T&E Species Survey is Completed
• Facility Study Complete

IS206

Project Summary:

• 300 MW
• 2305 Acres
• Jones County, Texas
• Production: 763,334 MWh/year
• RTO: ERCOT
• Queue #: 23INR0010
• (COD): 4/13/2023 Est.
• PPA: TBD

Completed Project Milestones:

• PVSyst & 8760 Reports
• Initial Design and Equipment Selection
• All Utility Interconnection Request documentation & required attachments
• Plant Modeling Data (power flow, reactive power, etc.)
• Modeling single line (device, cable and impedance information)
• 20-year Executed Lease & contains four 5-year extension options
• No Zoning Approval Required
• Screening Study Started
• Insurance Documentation
• FERC 556 Form ready to be filed

IS408

Project Summary:

• 85 MW
• 644 Acres
• Medina, TX
• Production: 197,748 MWh/year
• RTO: ERCOT
• Queue #: 23INR0014
• (COD): 4/20/2023 Est.
•PPA: TBD

Completed Project Milestonses:

• 20 year Executed Lease and
Contains four 5-year extension options
• No Zoning Approval Required
• Screening Study pending
• FAA 7460-1 Compliant
• FERC 556 Forms ready to be filed

IS416

Project Summary:

• 180 MW
• 1347 Acres
• Castro County, TX
• Production: 462,201 MWh/year
• RTO: ERCOT
• (COD): 4/20/2023 Est.
• Queue #: 23INR0015
• PPA: TBD 

Completed Project Milestones:

• PVSyst & 8760 Reports
• Initial design and equipment selection
• All Utility Interconnection Request documentation & required attachments
• Plant modeling data (power flow, reactive power, etc.)
• Modeling single line (device, cable and impedance information)
• FERC 556 Forms filed and accepted
• Insurance Documentation
• W-9 Forms
• 20-year Executed Lease & contains four 5-year extension options
• Preliminary Layout
• No Zoning Approval Required
• Screening Study Started
• FAA 7460-1 Compliant

IS75

Project Summary:

• 40 MW
• 340 Acres
• Haskell County, TX
• Production: 102427 MWh/year
• RTO: ERCOT/AEP
• Queue #: 20INR0012
• (COD): 5/15/2022 Est.
• PPA: Est. $23.30/MWh

Completed Project Milestones:

• 20-year Executed Lease & contains four 5-year extension options
• Title /Mineral Rights searched to sovereignty
• ALTA Survey that covers all project parcels including any easement parcels is Completed
• Topographical Survey is Completed
• Property Tax Evaluation is Completed
• No Zoning Approval Required
• Phase One (ESA) Completed 2018
• Full Site Wetland Delineation is Completed
• Approved jurisdictional determination from Army Corp. of Engineers
• T&E Species Survey is Completed
• Desktop Soil Survey is Completed
• Screening Study is Completed
• Project is in Full Interconnect Study (FIS)

IS137

Project Summary:

• 20 MW
• 150 Acres
• Uvalde County, TX
• Production: 47722 MWh/year
• RTO: ERCOT/AEP
• Queue #: 20INR0013
• (COD): 5/15/2022 Est.
• PPA: Est. $26.94/MWh

Completed Project Milestones:

• 20-year Executed Lease & contains four 5-year extension options
• Title /Mineral Rights searched to sovereignty
• ALTA Survey that covers all project parcels including any easement parcels is Completed
• Topographical Survey is Completed
• Property Tax Evaluation is Completed
• No Zoning Approval Required
• Phase One (ESA) Complete 2018
• Full Site Wetland Delineation is Completed
• Approved jurisdictional determination from Army Corp. of Engineers
• T&E Species Survey is Completed
• Desktop Soil Survey is Completed
• Screening Study is Completed
• Project is in Full Interconnect Study (FIS)

IS267

Project Summary:

• 30 MW
• 207 Acres
• Greer County, OK
• Production: 74327 MWh/year
• RTO: SPP
• Queue #: GEN-2017-051
• (COD): Q2 2023 Est.
• PPA: Est. $24.00/MWh

Completed Project Milestones:

• 20-year Executed Lease & contains four 5-year extension options
• Title /Mineral Rights search to sovereignty is Completed
• Property Tax Evaluation Estimate
• Zoning determination letter received
• Phase One (ESA) Complete 2018
• Full Site Wetland Delineation is Completed
• Approved jurisdictional determination from Army Corp. of Engineers
• T&E Species Survey is Completed
• Desktop Soil Survey is Completed
• Accepted into Definitive Interconnection System Impact Study (DISIS)

IS339 

Project Summary:

• 50 MW
• 355 Acres
• Cotton County, OK
• Production: 120338 MWh/year
• RTO: SPP
• Queue #: GEN-2017-053
• (COD): Q2 2023 Est.
• PPA: Est. $24.00/MWh

Completed Project Milestones:

• 20-year Executed Lease & contains four 5-year extension options
• Title /Mineral Rights search to sovereignty is Completed
• Property Tax Estimate
• No Zoning Approval Required
• Phase One (ESA) Completed 2018
• Full Site Wetland Delineation is Completed
• Approved jurisdictional determination from Army Corp. of Engineers
• T&E Species Survey is Completed
• Desktop Soil Survey is Completed
• Accepted into Definitive Interconnection System Impact Study (DISIS)

ISS has many more project available, Please contact our team today for more information.